Pärnu Graniit was sub-contracted to design, supply, and install the first bridge abutments in Europe using the Redi-Rock Positive Connection (PC) blocks for the Mustla Bridge along Highway 2 in Estonia. The 90 meters of near vertical, mechanically stabilized earth (MSE) walls that reached 4.16 meters (13.7 feet) tall was a technically challenging project for the young company, and it got even more technical when it was discovered just prior to construction that the traffic barrier would need to be moved back 1 meter (3 feet).
Subscribe to magazineContact
Redi-Rock International 2940 Parkview Drive, Petoskey, MI 49770, USA T +1 866 222 8400, F +1 231 237 9521 andrew@redi-rock.com, makeredi-rock.com