Steel reinforced precast concrete elements withCEM II/A-S 52.5 N, Amöneburg works

Object report / internal cleaning plant for passenger trains, Frankfurt am Main

A new internal cleaning plant for passenger trains was built from the beginning of 2010 near the main railway station in Frankfurt in the so-called ‘Mainz basin’. Water and cleaning agents thereby flow directly out of the carriages into track support trays of the type EW 7500 which are impermeable to liquids. The 2 x 360 m long plant consists of 7.5 m long and 3.8 m wide individual elements, which are manufactured as liquid-tight components at Stelcon in Germersheim using Dyckerhoff Comfort Dreifach CEM II/A-S 52.5 N.

Subscribe to magazine

Contact

BTE Stelcon Deutschland GmbH Philipsburger Straße 4 · 76726 Germersheim, Germany T +49 7274 70280 · F +49 7274 7028119 www.stelcon.de info@stelcon.de

Events

06.08.2024 - 08.08.2024
14.08.2024 - 16.08.2024
21.08.2024 - 24.08.2024