Pumping aid

Leyco chemische Leyde GmbH, 50999 Cologne, Germany

Before pumping concrete, water is mixed with cement and sand to form a grout that is send to the system. A hard sponge ball should be placed in the line ahead of the slurry to insure maximum coating of the pipe.