Bored piles are used on international building sites, especially in large projects and in regions with arduous ground conditions. The reinforcement cages required for this are still often manufactured in manual work steps. This is time consuming and personnel-intensive. It can be achieved more simply and more effectively using modern production plants equipped with welding robots, with which cages can be produced in various diameters, rod spacings and inclinations, and in virtually unlimited lengths.
Subscribe to magazineContact
Pedax Bitburg Maschinenbau GmbH Industriestraße 10 A 54634 Bitburg, GERMANY T +49 6561 96670 F +49 6561 966790 www.stemapedax.com info@pedax.de