To keep up with market demand for high quality products, Kilsaran Group (located in Dublin, Ireland) opted for Kraft’s Quadrix® Accelerated Concrete Curing Systems to get the job done. Kraft specially designed two curing systems, providing high early strength that matched that of three week, air cured concrete. Doing so allowed Kilsaran to double shift its existing manufacturing plants, reduce operating costs, increase color uniformity and reduce cement consumption (when compared to other existing facilities). According to Declan McCartney, Director of Projects at Kilsaran Group, “It was a no-brainer.”
Contact
Kraft Curing Systems GmbH Muehlenberg 2 49699 Lindern, Germany T +49 5957 96120 F +49 5957 961210 info@kraftcuring.com www.kraftcuring.com