In a 17 acre, newly developing industrial area in Endingen am Kaiserstuhl, Germany, a separate sewage system with a pipe length of approximately 5,000 feet is being constructed. While plastic pipes are being used to drain the surface water, Schlüsselbauer’s new Perfect Pipe system is being used to drain the wastewater. As a result, the area’s future occupants will be prepared for a wide range of wastewater scenarios. In addition to better static characteristics of the concrete base pipe, the managing engineer’s office is primarily convinced by the solid connection of the concrete pipe to its HDPE lining. Thanks to the HDPE inliner, the highly durable pipe is guaranteed, even with aggressive media ranging from pH-1 to pH-14. While the construction company is impressed by the simple and safe installation of the pipe, the end-customer – representatives of the community of Endingen – is accordingly thrilled with the rapid installation progress and, of course, the durable resilience of the system.
Contact
Schlüsselbauer Technology GmbH & Co KG Hörbach 4 4673 Gaspoltshofen, Autria T +43 7735 7144 0, F +43 7735 7144 56 sbm@sbm.at www.sbm.at www.perfectsystem.eu Bernhard Müller GmbH Gewerbegebiet Heid Ambros-Nehren-Straße 7 77855 Achern, Germany T +49 7841 2040, F +49 7841 2701 info@mueller-schachttechnik.de www.mueller-schachttechnik.de