For the Stuttgart-Ulm railway project a new high-speed section is being built from Wendlingen (Neckar) to Ulm alongside the A8 motorway. The new section will offer a fast and convenient way to get over the Swabian Alb. Regional, national and international travel times will be significantly reduced. The Baden-Württemberg region will be permanently incorporated into the European high-speed network. The section includes the approximately 8 km-long Albvorland Tunnel between Wendlingen and Kircheim unter Teck. The production of the precast concrete tunnel liner segments required for the construction of the tunnel, are cured with a system that is designed, supplied and serviced by Kraft Curing Systems.
Contact
Kraft Curing Systems GmbH Muehlenberg 2, 49699 Lindern, Germany T +49 5957 96120, F +49 5957 961210 info@kraftcuring.com, www.kraftcuring.com