The new Storstrøm bridge created from precast concrete elements – Quality, costs and construction…

Putzmeister Concrete Pumps GmbH, 72631 Aichtal, Germany

… time speak for themselves! Denmark and Germany are moving closer together thanks to the new prefabricated bridge over the Storstrøm. When completed, the bridge will connect the Danish islands of Zealand and Falster via the island of Masnedø. With a total length of 4 km, it becomes Denmark’s third longest bridge and thus ranks behind the Øresunds Bridge and the bridge over the Great Belt. In the future, both trains (up to 200 km/h) and cars (up to 80 km/h) will travel over the Storstrøm Bridge. The structure is an integral part of the rail link between the Danish capital Copenhagen and Germany. Future commercial and passenger transport between Scandinavia and Germany will be much more efficient.

Subscribe to magazine

Contact

Putzmeister Concrete Pumps GmbH Max-Eyth-Str. 10 72631 Aichtal, Germany T +49 7127 599-0 pmh@putzmeister.com www.putzmeister.com

Events

04.11.2024 - 07.11.2024
05.11.2024 - 08.11.2024
13.11.2024 - 14.11.2024