An innovative and efficient concept for a modular hybrid floating pier for the U.S. Naval fleet was first conceived in 1998 by a development team that included the Naval Facilities Engineering Service Center (NFESC) in California and BERGER/ ABAM Engineers Inc. of Federal Way, Washington. The Modular Hybrid Pier (MHP) ushers in a new class of military ship mooring facility that incoporates state-of-the-art materials and the highest level of operational system technologies for all class of naval vessels. The MHP is designed to dramatically reduce the repair costs of traditional docking facilities by up to 80 percent and deliver a service life of 100 years.
Subscribe to magazine