GCC moves to the technological forefrontin the constructions materials industry

Kraft Energy Systems, Inc., Fort Worth, TX 76137, U.S.A.

When Grupo Cementos Chihuahua, GCC, of Mexico decided to build a new block, paver and architectural products production facility in Juarez, Mexico the decision was made to employ a Kraft Energy accelerated concrete curing system in order to maximize production efficiency, while improving the characteristics of the finished product. After 8 months of production, an overall 35% to 40% energy cost savings and a minimum of 10% cement savings with significant gains in product quality and uniformity have proven the decision to install the vapor curing system.

Subscribe to magazine

Contact

Kraft Energy Systems, Inc. 5450 Stratum Drive Fort Worth, TX 76137, U.S.A. T +1 817 338 4997 · F +1 817 338 0233 mail@kraftenergy.com · www.kraftenergy.com Quadra 40 Rte de Findrol Contamine-sur-Arve 74130 Bonneville, FRANCE T +33 450 039221 · F +33 450 036997 www.quadra-concrete.com info@quadra-concrete.com

Events

13.01.2025 - 18.01.2025
21.01.2025 - 23.01.2025
23.01.2025 - 25.01.2025