One of the product innovations shown at the world’s leading fairs in 2010 is now ready to be launched on the market - the concrete-plastic composite pipe Perfect Pipe +. This new pipe system changes construction for wastewater pipes as well as the associated production technology. The pipe has a highly resistant lining anchored firmly in the concrete. In addition, the new pipe with its flat profile has advantages over circular components in terms of stability and installation process. Numerous material and functional tests to be completed in advance of the launch are currently being carried out - with remarkable results, as summarised in this report. Perfect Pipe + doesn’t just have those positive features for sewer construction, it opens up entirely new perspectives for the production of prefabricated parts.
Contact
Schlüsselbauer Technology GmbH & Co KG Hörbach 4 4673 Gaspoltshofen, Austria T +43 7735 71440 F +43 7735 714456 www.perfectsystem.eu sbm@sbm.at